Case Studies
- Biomass-Fired Generation
-
Electric Boilers
- 2,500 KW Electrode Boiler Installation
- 6,000 KW Electrode Boiler Installation
- 12,000 KW Electrode Boiler Installation (GHS)
- 12,000 KW Electrode Boiler Installation (SRHC)
- 18,000 KW Electrode Boiler Installation (Mitsubishi)
- 31,000 KW Electrode Boiler Installation (RR Donnelley)
- 31,000 KW Electrode Boiler Installation (Tobaccoville)
- 36,000 KW Electrode Boiler Installation (Whitaker Park)
- Environmental Compliance
-
Industrial Utility Infrastructure
- Ash Handling System
- Boiler & Boiler Controls
- Chilled Water & Compressed Air System
- Chilled Water System
- Coal Handling System
- Coal Unloading Station
- Continuous Emissions Monitoring System
- Cooling Tower
- Cooling Tower
- Demineralized Water Treatment Plant
- Distributive Control System
- Distributive Control System (Multi Boiler Complex)
- Distributive Control System for Steam Boilers
- Ductwork & Support Structures
- Electric Distribution & Sub-Stations
- Electric Sub-stations & Motor Control Centers
- Electric Switch Gear
- Fuel Unloading & Storage Facility
- Gas/Oil-fired Water Tube Boilers
- Hyundai Mfg of America
- NOx Emmissions Control System
- Process Water Plant (2-5 million gpm)
- Power Cogeneration Facilities
Distributive Control System (Multi Boiler Complex)
Boiler House Control System Upgrade
Chemical Company – Virginia, USA
A large chemical company in Virginia needed to upgrade and replace
obsolete control systems within the power house. They also wanted
to provide a consolidated operator interface to the boilers and their
related equipment. Peregrine Energy accomplished this by installing a
Distributive Control System (DCS), which has facilitated
improvements to overall boiler efficiencies and control room
operation.