Case Studies
- Biomass-Fired Generation
-
Electric Boilers
- 2,500 KW Electrode Boiler Installation
- 6,000 KW Electrode Boiler Installation
- 12,000 KW Electrode Boiler Installation (GHS)
- 12,000 KW Electrode Boiler Installation (SRHC)
- 18,000 KW Electrode Boiler Installation (Mitsubishi)
- 31,000 KW Electrode Boiler Installation (RR Donnelley)
- 31,000 KW Electrode Boiler Installation (Tobaccoville)
- 36,000 KW Electrode Boiler Installation (Whitaker Park)
- Environmental Compliance
-
Industrial Utility Infrastructure
- Ash Handling System
- Boiler & Boiler Controls
- Chilled Water & Compressed Air System
- Chilled Water System
- Coal Handling System
- Coal Unloading Station
- Continuous Emissions Monitoring System
- Cooling Tower
- Cooling Tower
- Demineralized Water Treatment Plant
- Distributive Control System
- Distributive Control System (Multi Boiler Complex)
- Distributive Control System for Steam Boilers
- Ductwork & Support Structures
- Electric Distribution & Sub-Stations
- Electric Sub-stations & Motor Control Centers
- Electric Switch Gear
- Fuel Unloading & Storage Facility
- Gas/Oil-fired Water Tube Boilers
- Hyundai Mfg of America
- NOx Emmissions Control System
- Process Water Plant (2-5 million gpm)
- Power Cogeneration Facilities
18,000 KW Electrode Boiler Installation (Mitsubishi)
Electrode Boiler Installation – 18,000 KW
Mitsubishi Polyester Films, Greer, SC
Mitsubishi, as a world-class manufacturer of polyester film, was
facing increasing competition from U.S. based and overseas
producers. Energy costs had risen significantly with the recent
increase in natural gas pricing and Mitsubishi wanted to better
manage their energy cost.